Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressSep 22, 2025 – Jun 21, 2027
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 15 miN2 mi
RoadwaySR 30
CountyFranklin County
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
SR 30 (US 98/319) From S Franklin St To Carrabelle River Bridge
Resurfacing
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed56%
Of the 21 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion283 days
Remaining against FDOT's estimated contract completion date.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T3852
$15M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$15M
Phase line item (44576115201)FDOT Active Construction
$10.2M
Contract line items
445761-1-52-01This phase$10.2M
445761-1-52-02$686.5K
445761-1-52-03$4.1M
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
American Sand & X-Cavation, Inc. Dba American Sand & Asphalt
FDOT project manager
Virgil Versaggi
Contract status
Active
Contract time (bid)
610 days
Time added by adjustments
57 days
Federal project number
D322069B
Cross-check · contracts feed$15M
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗