Source: USASpending.gov, fetched 2026-06-20. Matched by FHWA project title near-exact match — "SR5A(US1)(KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO780003".
Unlock with TransitAtlas Pro to get full project intelligence and alerts.
Programmed in the FDOT Five-Year Work Program (FY 2025), managed by FDOT District Two. Detailed fact sheets and outreach materials are published once construction approaches. View in the FDOT Work Program
Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressOct 20, 2025 – Jun 10, 2027
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 0.1 miN0.1 mi
RoadwaySR 5
CountySt. Johns County
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
SR5A(US1)(KING St) Over San Sebastian River Bridge No780003
Bridge & Structures
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed55%
Of the 20 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion270 days
Remaining against FDOT's estimated contract completion date.
Data freshness18 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T2A28
$13.4M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$13.4M
Phase line item (43742815201)FDOT Active Construction
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
SRState Road (S.R.) 5/United States (U.S.) 1 Lighting Improvement Project Midway Road to south of Edwards RoadProject
SSState Road (S.R.) 5/United States (U.S.) 1 SUN Trail Project from SE Bridge Road to Osprey Street and S.R. 5/U.S. 1 Resurfacing, Restoration and Rehabilitation (RRR) Project from south of S.R. A1A/SE Dixie Hwy to Osprey StreetProject
SCState Road (S.R.) 5/US-1 Resurfacing in Martin CountyProject