Fact sheets, public-meeting materials, and construction updates are published by FDOT District Four. View on the source site
Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressSep 2, 2025 – Aug 18, 2027
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 1.8 miN1 mi
RoadwaySR 5
CountyPalm Beach County
Length3.142 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
S.R. 5/U.S. 1 from 59th Street to C.R. 850/Northlake Boulevard
3.142 miles
Project length
Bicycle & Pedestrian
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed52%
Of the 23 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion341 days
Remaining against FDOT's estimated contract completion date.
Cost sourcesDiffer by 1.0%
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T4697
$13.5M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$13.5M
Project costFDOT district project site
$13.4M
Phase line item (43838625201)FDOT Active Construction
$12.9M
$4.3M / mileConstruction contract value ÷ 3.142 miles
Contract line items
438386-2-52-01This phase$12.9M
438386-2-52-02$19.3K
438386-2-52-03$158K
438386-2-52-04$503K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗