Programmed in the FDOT Five-Year Work Program (FY 2025), managed by FDOT District Five. Detailed fact sheets and outreach materials are published once construction approaches. View in the FDOT Work Program
Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressSep 29, 2025 – Jun 23, 2026
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
SPState Road (S.R.) 5/U.S. 1 Resurfacing, Restoration, and Rehabilitation ProjectProject
SPState Road (S.R.) 805/ United States (U.S.) 1/ North Dixie Highway and S.R. 9/ I-95 Lighting ProjectProject
UPU.S. 1/State Road (S.R.) 5 Earman River Bridge Replacement ProjectProject
SRState Road (S.R.) 5/United States (U.S.) 1 Lighting Improvement Project Midway Road to south of Edwards RoadProject
SSState Road (S.R.) 5/United States (U.S.) 1 SUN Trail Project from SE Bridge Road to Osprey Street and S.R. 5/U.S. 1 Resurfacing, Restoration and Rehabilitation (RRR) Project from south of S.R. A1A/SE Dixie Hwy to Osprey StreetProject
ULUS-1/FEDERAL Highway Between Gulfstream Blvd& Bamboo LaneProject
UBUS-1/SR-5 Rooseveltbridge Over St Lucie River BridgesProject