Interchange on I-95 / S.R. 804 in Palm Beach County (2.354 miles).
S.R. 9/I-95 just north and south of Boynton Beach Boulevard including the on- and off-ramps, and on Boynton Beach Boulevard from Old Boynton Road to NW 3rd Avenue in the City of Boynton Beach
Mastec Civil LLC has been building it for FDOT District Four since Aug 11, 2025. FDOT estimates the contract finishes on Jul 20, 2028.
Construction contract value
$64.6M
Contract T4691, this project only
Prime contractor
Mastec Civil LLC
FDOT record
Aug 11, 202544% of contract time elapsed · 604 days from todayJul 20, 2028
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 0.8 miN0.25 mi
RoadwayI-95
CountyPalm Beach County
Length2.354 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
S.R. 9/I-95 just north and south of Boynton Beach Boulevard including the on- and off-ramps, and on Boynton Beach Boulevard from Old Boynton Road to NW 3rd Avenue in the City of Boynton Beach
2.354 miles
Project length
Interchange · Planning & Study
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Oct 15, 2026
Contract time elapsed44%
Of the 35 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion604 days
Remaining against FDOT's estimated contract completion date.
Cost sourcesDiffer by 0.9%
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness39 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T4691
$64.6M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$64.6M
Project costFDOT district project site
$64M
Phase line item (43580415201)FDOT Active Construction
$64.6M
$27.4M / mileConstruction contract value ÷ 2.354 miles
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
S.R. 9/I-95 just north and south of Boynton Beach Boulevard including the on- and off-ramps, and on Boynton Beach Boulevard from Old Boynton Road to NW 3rd Avenue in the City of Boynton Beach