TransitAtlasConnecting Organizations. Building Transportation.
Back to FDOT District One

Projects

606 projects managed by FDOT District One

Updated Jul 27, 2026 · Sourced from FDOT Work Program & Active Construction data

606

Total Projects

$1.4B

Total Value

554

Active Projects

52

Completed

Try:I-75SR 45Polkor a project name / FPID

Phase
Corridor
County
Contractors
Work Type
Fiscal Year
Project Value
Status
Sort
Polk109 projects · $459.4M
Open for PursuitSR 35

SR 35 (US 98) From N Of West Socrum Loop Rd To S Of CR 54

Prime

Prince-Ajax US-98 JV

Est. Completion

Sep 2027

1 Organizations0 People9 Nearby Projects
PA

$123.8M

Total Value

ActiveView Project
Under ConstructionI-4

I-4 (SR 400) At SR 33 Interchange Modification

Prime

Lane Construction Corporation (The)

Start

Jan 2025

Est. Completion

May 2029

1 Organizations0 People10 Nearby Projects
L

$118.4M

Total Value

ActiveView Project
Under ConstructionSR 33

SR 33 From Old Combee Rd To S Of Firstpark Blvd S

Prime

Lane Construction Corporation (The)

Start

Jan 2025

Est. Completion

May 2029

1 Organizations0 People12 Nearby Projects
L

$39.1M

Total Value

ActiveView Project
Under ConstructionI-4

I-4 (SR 400) At Csxrailroad

Prime

Mastec Civil LLC

Start

Apr 2021

Est. Completion

Jul 2026

1 Organizations0 People12 Nearby Projects
MC

$33.1M

Total Value

CompletedView Project
Under ConstructionSR 33

SR 33 (Lakeland Hills Blvd) From Parkview Place To Granada St

Prime

Hubbard Construction Company

Start

Oct 2024

Est. Completion

Oct 2026

1 Organizations0 People13 Nearby Projects
H

$19.2M

Total Value

ActiveView Project
Under ConstructionI-4

I-4 (SR 400) Wildlife Crossing East Of SR 33

Prime

Lane Construction Corporation (The)

Start

Jan 2025

Est. Completion

May 2029

1 Organizations0 People10 Nearby Projects
L

$18.2M

Total Value

ActiveView Project
Under ConstructionSR 35

SR 35 (US 17) From 9Th St NW To N Of Oak Hammock Loop

Prime

Ajax Paving Industries Of Florida LLC

Start

Jan 2025

Est. Completion

Jan 2026

1 Organizations0 People3 Nearby Projects
AP

$16.1M

Total Value

CompletedView Project
Under ConstructionSR 60

SR 60 From W Of Saddlebag Lake Road To E Of Tiger Lake Road

Prime

Ajax Paving Industries Of Florida LLC

Start

Apr 2025

Est. Completion

Mar 2026

1 Organizations0 People
AP

$11.9M

Total Value

CompletedView Project
Open for PursuitI-4

I-4 (SR 400) From Galloway Rd To SR 35

Prime

C.W. Roberts Contracting, Inc.

Est. Completion

Oct 2026

1 Organizations0 People12 Nearby Projects
CW

$10.5M

Total Value

ActiveView Project
Under ConstructionSR 35

SR 35 (US 98) From N Of SR 60 To N Of CR 540A

Prime

Ajax Paving Industries Of Florida LLC

Est. Completion

Nov 2026

1 Organizations0 People5 Nearby Projects
AP

$8.8M

Total Value

ActiveView Project
+99 more in Polk County — show all 109
Lee84 projects · $100M
Under ConstructionI-75

I-75 (SR 93) At CR 876 / Daniels Parkway

Prime

Watson Civil Construction, Inc.

Start

Jan 2026

Est. Completion

Mar 2028

1 Organizations0 People4 Nearby Projects
WC

$42.5M

Total Value

ActiveView Project
Under ConstructionI-75

I-75 (SR 93) From Sof Bonita Beach Rd To N Of Alico Rd

Prime

Preferred Materials Inc.

Start

Jun 2024

Est. Completion

Apr 2026

1 Organizations0 People1 Nearby Projects
PM

$23.0M

Total Value

CompletedView Project
Under ConstructionSR 80

SR 80 From Buckingham Road To Hendry County Line

Prime

Ajax Paving Industries Of Florida LLC

Start

May 2024

Est. Completion

Oct 2025

1 Organizations0 People
AP

$19.8M

Total Value

CompletedView Project
Under ConstructionSR 739

SR 739 From Caloosahatchee River To N Of SR 78

Prime

Ajax Paving Industries Of Florida LLC

Start

Jan 2025

Est. Completion

Jan 2026

1 Organizations0 People4 Nearby Projects
AP

$6.5M

Total Value

CompletedView Project
Under ConstructionSR 80

SR 80 From Veronicashoemaker To Kingston Dr

Prime

Wright Construction Group, Inc.

Start

Oct 2025

Est. Completion

Jun 2026

1 Organizations0 People4 Nearby Projects
W

$5.2M

Total Value

CompletedView Project
Under ConstructionSR 82

SR 82 From Ford St To Veronica Shoemaker

Prime

Wright Construction Group, Inc.

Start

Oct 2025

Est. Completion

Jun 2026

1 Organizations0 People4 Nearby Projects
W

$1.8M

Total Value

CompletedView Project
Open for PursuitSR 45

SR 45 (US 41) Over Caloosahatchee Rv Br #120002 & Edison Br NE #120157

Prime

M & J Construction Company Of Pinellas County, Inc.

Est. Completion

Mar 2026

1 Organizations0 People4 Nearby Projects
MJ

$1.2M

Total Value

CompletedView Project
Under ConstructionSR 78

SR 78 From SW 35Th Pl To Burnt Store Rd

0 Organizations0 People
ProgrammedSR 80

SR 80 From Shoreland Drive To CR 80 (Buckingham Rd)

0 Organizations0 People
+74 more in Lee County — show all 84
Sarasota68 projects · $295.3M
Under ConstructionI-75

I-75 (SR 93) At Fruitville Road/Cr 780

Prime

Prince Contracting, LLC.

Start

Oct 2024

Est. Completion

Mar 2029

1 Organizations0 People7 Nearby Projects
PC

$177.0M

Total Value

ActiveView Project
Under Construction

River Rd From US 41To I-75

Prime

The De Moya Group Inc.

Start

Aug 2021

Est. Completion

Feb 2027

1 Organizations0 People4 Nearby Projects
DM

$60.9M

Total Value

ActiveView Project
Open for PursuitSR 776

SR 776 From Charlotte Co Line To S Of US 41

Prime

Preferred Materials Inc.

Est. Completion

Jan 2027

1 Organizations0 People3 Nearby Projects
PM

$13.1M

Total Value

ActiveView Project
Under ConstructionSR 45

SR 45 (US 41) From W Of West Villages Pkwy To W Of Woodmere Rd

Prime

Preferred Materials Inc.

Start

Aug 2025

Est. Completion

Jun 2026

1 Organizations0 People3 Nearby Projects
PM

$8.1M

Total Value

CompletedView Project
Under ConstructionI-75

I-75 At Toledo Blade Interchange Improvements

Prime

Ajax Paving Industries Of Florida LLC

Start

Apr 2025

Est. Completion

Mar 2027

1 Organizations0 People1 Nearby Projects
AP

$6.9M

Total Value

ActiveView Project
Under ConstructionI-75

I-75 At Sumter Blvdinterchange Improvements

Prime

Ajax Paving Industries Of Florida LLC

Start

Apr 2025

Est. Completion

Mar 2027

1 Organizations0 People2 Nearby Projects
AP

$5.5M

Total Value

ActiveView Project
Under ConstructionSR 45

SR 45 (US 41) From Lychee Rd To Bay St

Prime

Preferred Materials Inc.

Start

Aug 2025

Est. Completion

Jun 2026

1 Organizations0 People2 Nearby Projects
PM

$5.4M

Total Value

CompletedView Project
Under ConstructionSR 789

SR 789 East Of Sunset Drive To Bird Key Drive

Prime

Russell Engineering, Inc.

Start

Jan 2026

Est. Completion

Dec 2026

1 Organizations0 People7 Nearby Projects
R

$4.7M

Total Value

ActiveView Project
Under ConstructionSR 72

SR 72 (Clark Rd) From Honore Ave To W Of Gantt Rd

Prime

Ajax Paving Industries Of Florida LLC

Start

Jun 2025

Est. Completion

Feb 2026

1 Organizations0 People6 Nearby Projects
AP

$4.6M

Total Value

CompletedView Project
Open for PursuitSR 758

SR 758 Over Sarasota Bay Bridge

Prime

Seacoast Incorporated

Est. Completion

May 2026

1 Organizations0 People7 Nearby Projects
SI

$4.3M

Total Value

CompletedView Project
+58 more in Sarasota County — show all 68
Manatee68 projects · $149.1M
Under ConstructionSR 70

SR 70 From Lorraineroad To Bourneside Blvd

Prime

The De Moya Group Inc.

Start

Aug 2023

Est. Completion

Jul 2027

1 Organizations0 People5 Nearby Projects
DM

$70.2M

Total Value

ActiveView Project
Under ConstructionSR 70

SR 70 From Bourneside Blvd To Waterbury Rd

Prime

Russell Engineering, Inc.

Start

Sep 2024

Est. Completion

May 2027

1 Organizations0 People2 Nearby Projects
R

$31.4M

Total Value

ActiveView Project
Under ConstructionSR 55

SR 55 (US 19) From 23Rd Ave W To 39 St E

Prime

Preferred Materials Inc.

Start

Sep 2025

Est. Completion

Feb 2027

1 Organizations0 People10 Nearby Projects
PM

$12.9M

Total Value

ActiveView Project
Under ConstructionI-275

I-275 (SR 93) From I-75 To Terra Ceia River

Prime

Preferred Materials Inc.

Start

Aug 2025

Est. Completion

Oct 2026

1 Organizations0 People6 Nearby Projects
PM

$8.7M

Total Value

ActiveView Project
Under ConstructionSR 64

SR 64 From 9Th St To Braden River

Prime

Superior Asphalt, Inc.

Start

Jan 2025

Est. Completion

Oct 2025

1 Organizations0 People10 Nearby Projects
SA

$7.0M

Total Value

CompletedView Project
Under ConstructionSR 45

SR 45 (US 41) From N Of SR 55 (US 19) To N Of 69Th St E

Prime

Preferred Materials Inc.

Start

Jan 2026

Est. Completion

Jun 2026

1 Organizations0 People7 Nearby Projects
PM

$5.2M

Total Value

CompletedView Project
Under ConstructionSR 45

SR 45 (US 41) From 63Rd Ave To 53Rd Ave

Prime

Traffic Management Solutions, LLC

Start

Jan 2026

Est. Completion

Aug 2026

1 Organizations0 People12 Nearby Projects
TM

$4.7M

Total Value

ActiveView Project
Under ConstructionSR 789

SR 789 From S Of Coquina Park Ent To SR 64

Prime

Ajax Paving Industries Of Florida LLC

Start

Nov 2025

Est. Completion

Mar 2026

1 Organizations0 People5 Nearby Projects
AP

$3.1M

Total Value

CompletedView Project
Under ConstructionI-75

I-75 (SR 93) Adms From Sarasota County Line To I-275

Prime

Transcore ITS, LLC.

Start

May 2025

Est. Completion

Nov 2026

1 Organizations0 People9 Nearby Projects
TI

$3.1M

Total Value

ActiveView Project
Open for PursuitSR 70

SR 70 (15Th St E) From 30Th Ave E To 26Th Ave E

Prime

Superior Asphalt, Inc.

Est. Completion

Apr 2026

1 Organizations0 People12 Nearby Projects
SA

$1.2M

Total Value

CompletedView Project
+58 more in Manatee County — show all 68
Collier55 projects · $197.2M
Under ConstructionI-75

I-75 (SR 93) At SR 951

Prime

The De Moya Group Inc.

Start

Sep 2022

Est. Completion

Sep 2026

1 Organizations0 People3 Nearby Projects
DM

$97.3M

Total Value

ActiveView Project
Under ConstructionSR 82

SR 82 From Hendry County Line To Gator Slough Lane

Prime

Ajax Paving Industries Of Florida LLC

Start

Sep 2024

Est. Completion

Oct 2027

1 Organizations0 People1 Nearby Projects
AP

$35.0M

Total Value

ActiveView Project
Under ConstructionI-75

I-75 (SR 93) From Mile Point 33.989 To Mile Point 46.000

Prime

Ohla USA Inc

Start

Dec 2024

Est. Completion

Apr 2026

1 Organizations0 People1 Nearby Projects
O

$28.5M

Total Value

CompletedView Project
Under ConstructionI-75

I-75 At Pine Ridge Road

Prime

Sacyr Construccion Sa

Start

Mar 2025

Est. Completion

Jan 2027

1 Organizations0 People3 Nearby Projects
SC

$25.0M

Total Value

ActiveView Project
Under ConstructionSR 90

SR 90 (US 41) From N Of Thomasson Dr To S Ofsouthwest Blvd

Prime

Preferred Materials Inc.

Start

May 2025

Est. Completion

Feb 2026

1 Organizations0 People2 Nearby Projects
PM

$6.4M

Total Value

CompletedView Project
Under ConstructionSR 29

SR 29 From N Of Wagon Wheel Rd To S Of I-75

Prime

Preferred Materials Inc.

Start

May 2025

Est. Completion

Feb 2026

1 Organizations0 People
PM

$2.6M

Total Value

CompletedView Project
Under ConstructionSR 45

SR 45 (US 41) From Lee County Line To N Of Old US 41

Prime

Ajax Paving Industries Of Florida LLC

Start

Dec 2025

Est. Completion

Mar 2026

1 Organizations0 People2 Nearby Projects
AP

$2.4M

Total Value

CompletedView Project
ProgrammedSR 29

SR 29 From CR 846 Eto N Of New Market Road W

0 Organizations0 People
ProgrammedSR 29

SR 29 From N Of Newmarket Rd To SR 82

0 Organizations0 People
Under ConstructionI-75

I-75 (SR 93) At SR 951 (Collier Blvd Interchange)

0 Organizations0 People
+45 more in Collier County — show all 55
Highlands51 projects · $48.1M
Under ConstructionSR 25

SR 25 (US 27) From Shoreline Dr To Davis & Gaines Rd

Prime

C.W. Roberts Contracting, Inc.

Start

Nov 2024

Est. Completion

Aug 2026

1 Organizations0 People2 Nearby Projects
CW

$18.2M

Total Value

ActiveView Project
Under ConstructionSR 25

SR 25 (US 27) From S Of Horn Rd To S Of Shoreline Dr

Prime

Ohla USA Inc

Start

Feb 2025

Est. Completion

Feb 2026

1 Organizations0 People2 Nearby Projects
O

$15.0M

Total Value

CompletedView Project
Open for PursuitSR 17

SR 17 From S Of CR 17 (Kenilworth Blvd) To Eof SR 25 (US 98 / US 27)

Prime

Ohla USA Inc

Est. Completion

Oct 2026

1 Organizations0 People1 Nearby Projects
O

$7.5M

Total Value

ActiveView Project
Under ConstructionSR 25

SR 25 (US 27) From S Of Tower St To N Of Tower St

Prime

C.W. Roberts Contracting, Inc.

Start

Nov 2024

Est. Completion

Aug 2026

1 Organizations0 People2 Nearby Projects
CW

$4.8M

Total Value

ActiveView Project
Open for PursuitSR 17

SR 17 From South Oflake Verona Blvd To South Delaney Ave

Prime

Ohla USA Inc

Est. Completion

Oct 2026

1 Organizations0 People1 Nearby Projects
O

$2.6M

Total Value

ActiveView Project
Under ConstructionSR 700

SR 700 (US 98) Frome Of SR 25 (US 27) To E Of Floral Dr

0 Organizations0 People
Under ConstructionSR 700

SR 700 (US 98) Frome Of SR 25 (US 27) To E Of Floral Dr

0 Organizations0 People
Under Construction

Memorial Drive Frompompano Dr To Sebring Parkway

0 Organizations0 People
ProgrammedSR 25

SR 25 (US 27) From South Of SR 66 To North Of SR 66

0 Organizations0 People
ProgrammedCR 64

CR 64 From S Angelolake Rd To E Butler Rd

0 Organizations0 People
+41 more in Highlands County — show all 51
Hendry43 projects · $11.1M
Under ConstructionSR 25

SR 25 (US 27) From Stitt Ranch To Flaghole Rd

Prime

Ohla USA Inc

Start

Jul 2025

Est. Completion

Feb 2026

1 Organizations0 People1 Nearby Projects
O

$9.3M

Total Value

CompletedView Project
Under ConstructionSR 82

SR 82 From Lee County Line To Collier Countyline

Prime

Ajax Paving Industries Of Florida LLC

Start

Sep 2024

Est. Completion

Oct 2027

1 Organizations0 People1 Nearby Projects
AP

$1.1M

Total Value

ActiveView Project
Under ConstructionSR 29

SR 29 From Oklahomaave To Park Ave

Prime

V & H Construction, Inc.

Start

Dec 2025

Est. Completion

Apr 2026

1 Organizations0 People
VH

$733,320

Total Value

CompletedView Project
ProgrammedCR 80

CR 80A (Cowboy Way) From SR 80 To Bridge Street

0 Organizations0 People
Under ConstructionCR 835

CR 835 CR 833 And CR 846 Tangent Areas Adjacent To Canals

0 Organizations0 People
ProgrammedCR 835

CR 835 From CR 833 To S Of US 27

0 Organizations0 People
+33 more in Hendry County — show all 43
Charlotte33 projects · $29.9M
Under ConstructionSR 35

SR 35 (US 17) From SR 45 (US 41) To Bermont Road (CR 74)

Prime

Watson Civil Construction, Inc.

Start

Aug 2024

Est. Completion

Aug 2026

1 Organizations0 People1 Nearby Projects
WC

$14.9M

Total Value

ActiveView Project
Under ConstructionSR 31

SR 31 From CR 74 Tocr 74

Prime

Watson Civil Construction, Inc.

Start

Oct 2024

Est. Completion

May 2026

1 Organizations0 People
WC

$11.3M

Total Value

CompletedView Project
Under Construction

Tamiami Trail (SR 45/US 41) From William St To Peace River Bridge

Prime

Watson Civil Construction, Inc.

Start

Aug 2024

Est. Completion

Aug 2026

1 Organizations0 People1 Nearby Projects
WC

$3.7M

Total Value

ActiveView Project
Under ConstructionI-75

I-75 (SR 93) At N Jones Loop Road Interchange

0 Organizations0 People
Programmed

Harborview Road From Melbourne St To Date St

0 Organizations0 People
Under ConstructionSR 45

SR 45 (US 41) Tamiami Trail From Conway Blvd To Midway Blvd

0 Organizations0 People
Under ConstructionI-75

I-75 (SR 93) At CR 769 (Kings Hwy)

0 Organizations0 People
Under ConstructionSR 776

SR 776 (El Jobean Rd) At Flamingo Blvd

0 Organizations0 People
ProgrammedSR 776

SR 776 At Charlottesports Park

0 Organizations0 People
Under ConstructionSR 45

SR 45 (US 41) From Kings Highway To Conway Blvd

0 Organizations0 People
+23 more in Charlotte County — show all 33
Desoto31 projects · $19.5M
Under ConstructionSR 70

SR 70 From Peace River To SE Baker Street

Prime

Watson Civil Construction, Inc.

Start

Sep 2023

Est. Completion

Dec 2026

1 Organizations0 People
WC

$19.5M

Total Value

ActiveView Project
Under ConstructionCR 760

CR 760A Sidewalk From SW Welles Avenue To Carlton Avenue

0 Organizations0 People
Under ConstructionCR 760

CR 760A From SR 35 (US 17) To SW Shores Ave

0 Organizations0 People
Under ConstructionCR 760

CR 760 From US 17 To SW Aster Ave

0 Organizations0 People
Under Construction

SE West Avenue From SE Maple Drive To SE Esmeralda Drive

0 Organizations0 People
+21 more in Desoto County — show all 31
Hardee31 projects · $18M
Under ConstructionSR 66

SR 66 From SR 35 (US 17) To Charlie Creek

Prime

Ajax Paving Industries Of Florida LLC

Start

Sep 2024

Est. Completion

Mar 2026

1 Organizations0 People3 Nearby Projects
AP

$9.0M

Total Value

CompletedView Project
Under ConstructionSR 64

SR 64 From Pear St To S Barlow Rd

Prime

Superior Asphalt, Inc.

Start

Jul 2025

Est. Completion

Apr 2026

1 Organizations0 People3 Nearby Projects
SA

$6.9M

Total Value

CompletedView Project
Open for PursuitUS 17

US 17 (SR 35) At SR62

Prime

Sun Civil LLC

Est. Completion

Feb 2026

1 Organizations0 People4 Nearby Projects
SC

$1.4M

Total Value

CompletedView Project
Open for PursuitUS 17

US 17 At SR 62 Lighting

Prime

Sun Civil LLC

Est. Completion

Feb 2026

1 Organizations0 People4 Nearby Projects
SC

$629,071

Total Value

CompletedView Project
Programmed

Hardee County Bridge Improvement

0 Organizations0 People
ProgrammedSR 35

SR 35 (US 17) From Bell Street To S Of Heartland Way

0 Organizations0 People
Under ConstructionSR 636

SR 636 (E Main St) From First Ave To Griffinrd

0 Organizations0 People
ProgrammedSR 636

SR 636 (E Main St) From Griffin Rd To Riverside Dr

0 Organizations0 People
Programmed

Ten Mile Grade Frombride

0 Organizations0 People
+21 more in Hardee County — show all 31
Okeechobee21 projects · $24.6M
Under ConstructionSR 15

SR 15 (US 98) From NW 3Rd St To NE 120Th St

Prime

Ranger Construction Industries, Inc.

Start

Jul 2025

Est. Completion

Jun 2026

1 Organizations0 People5 Nearby Projects
RI

$7.5M

Total Value

CompletedView Project
Under ConstructionSR 15

SR 15 (US 98) From SE 30Th Terr To Martin County Line

Prime

C.W. Roberts Contracting, Inc.

Start

Aug 2025

Est. Completion

Feb 2026

1 Organizations0 People6 Nearby Projects
CW

$6.3M

Total Value

CompletedView Project
Under ConstructionSR 710

SR 710 From N Of SE48TH St To SW Martin Highway

Prime

C.W. Roberts Contracting, Inc.

Start

Jan 2026

Est. Completion

Apr 2026

1 Organizations0 People5 Nearby Projects
CW

$4.1M

Total Value

CompletedView Project
Under ConstructionSR 15

SR 15 (US 98) From SW 23Rd St To SW 3Rd St

Prime

Ranger Construction Industries, Inc.

Start

Jul 2025

Est. Completion

Jun 2026

1 Organizations0 People6 Nearby Projects
RI

$2.2M

Total Value

CompletedView Project
Under ConstructionSR 70

SR 70/700 (US 98) From W Of US 98 To E Of NW5TH Ave

Prime

Carr Construction, LLC

Start

Oct 2025

Est. Completion

Feb 2026

1 Organizations0 People6 Nearby Projects
C

$1.9M

Total Value

CompletedView Project
Under ConstructionSR 78

SR 78 From Bridge #910094 To US 98

Prime

Ranger Construction Industries, Inc.

Start

Jul 2025

Est. Completion

Jun 2026

1 Organizations0 People6 Nearby Projects
RI

$1.8M

Total Value

CompletedView Project
Under ConstructionUS 441

US 441 At 28Th St

Prime

Ranger Construction Industries, Inc.

Start

Jul 2025

Est. Completion

Jun 2026

1 Organizations0 People6 Nearby Projects
RI

$840,621

Total Value

CompletedView Project
ProgrammedSR 710

SR 710 From US 441 To L-63 Canal

0 Organizations0 People
Under ConstructionSR 15

SR 15 (US 98) Roundabout At SE 18Th Terrace

0 Organizations0 People
ProgrammedUS 98

US 98 At NW 9Th Street

0 Organizations0 People
+11 more in Okeechobee County — show all 21
Glades12 projects · $8.6M
Under ConstructionSR 25

SR 25 (US 27) At SR78

Prime

C.W. Roberts Contracting, Inc.

Start

Oct 2024

Est. Completion

Dec 2025

1 Organizations0 People1 Nearby Projects
CW

$8.6M

Total Value

CompletedView Project
Programmed

Cornelia Dr From CR78 To Dead End

0 Organizations0 People
Under ConstructionSR 25

SR 25 (US 27) From S Of Wayman Rd To N Of Fish Eating Creek

0 Organizations0 People
Under ConstructionSR 29

SR 29 From SR 78 Tocr 74

0 Organizations0 People
Under ConstructionSR 29

SR 29 From Hendry County Line To N Of SR 78

0 Organizations0 People
Programmed

Ave K B/W 8Th St & 9Th St

0 Organizations0 People
Programmed

8Th St B/W Ave J & Ave M

0 Organizations0 People
Programmed

Ave M B/W 5Th St & 8Th St

0 Organizations0 People
Programmed

Old US 27 From River Road To US 27

0 Organizations0 People
ProgrammedUS 27

US27 From Old US27 To North Of River Road

0 Organizations0 People
+2 more in Glades County — show all 12