Widen Sawgrass (SR869) Atlantic Blvd To Sample Rd (MP 9-12)(6To10 Lns)
$101.5M
Florida transportation projects with status, owning agency, corridor, and cost.
Updated Sep 6, 2026 · Sourced from FDOT Work Program & Active Construction data
Showing 49–72 of 3741 projects
Widen Sawgrass (SR869) Atlantic Blvd To Sample Rd (MP 9-12)(6To10 Lns)
$101.5M
US 19 (SR 55) From N Of SR 580 (Main St) To Northside Dr
$99.9M
Widen TPK (SR821) Campbell Dr To Tallahasseerd (Mp3-7)(4To6Lns)
$99.2M
I-4/SR-400 From East Of SR-535 To West Of SR-535
$98.1M
$97.9M
SR 826/Palmetto Expy - SR 826 Eastbound Ramp To SR 9A/I-95 Northbound
$94.7M
Widen Sawgrass (SR869) Sample To University Dr (MP 12-14.8)(6To8 Lns)
$94.4M
I-275/SR 93 SB Off Ramp To I-4 Fr N Of Floribraska To W Of 21St
$86.9M
SR-90/US Hwy-41/Tamiami Trail From Structures-333 To Structure S-334
$79.5M
SR 30A (US 98) Pc Beach Pkwy From Mandy Lane To East Of Nautilus St
$75.2M
SR-9/I-95 From South Of SW 10Th Street To North Of Hillsboro Blvd.
$74.3M
SR 30 (US 98) From Bayshore Road To Portsidedrive
$73.4M
SR 8 (I-10) Interchange West Of Crestview
$70.9M
SR 70 From Lorraineroad To Bourneside Blvd
$70.2M
SR 25/Okeechobee Rd From East Of NW 87 Ave To NW 79 Ave (Concrete)
$69.5M
TPK (SR91) Tsm&O Add Lanes Palm Beach C/L Toglades Rd (MP 73.1-76.4)
$65.7M
S.R. 9/I-95 just north and south of Boynton Beach Boulevard including the on- and off-ramps, and on Boynton Beach Boulevard from Old Boynton Road to NW 3rd Avenue in the City of Boynton Beach
$64.6M
I-95 From SR514 (Malabar Rd) To Concrete Joint N Of SR519 (Fiske Blvd)
$63.6M
$60.9M
I-75(SR 93) At NW 49Th St From End Of NW 49Th St To End Of NW 35Th St
$59.3M
I-95 Interchange Atpioneer Trail
$58.6M
SR 82 From Hendry County Line To Gator Slough Lane
$56.0M
SR 8 (I-10) Over SR10 (US 90A) Nine Mile Rd Bridge No. 480061 & 480066
$55.3M
SR 77 From North Ofrogers Road To South Of Cane Mill Road
$54.1M
More than a directory — the intelligence layer that BD, public-involvement, and engineering teams use to win work.
Know which incumbent contracts expire — and the window when they come up to bid.
Unlock RadarSee every active project in a corridor or county — with cost, status, and prime firm.
Open the mapTrace who works with whom across firms, agencies, and the people behind the work.
Explore the networkFind the active work nearest any project — the BD pipeline around a job you already know.
Find nearby work