Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressSep 22, 2025 – Dec 11, 2027
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 1.8 miN0.5 mi
RoadwayI-75
CountyBroward County
Length3.1 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
From S.R. 818/Griffin Road to SW 14th Street
3.1 miles
Project length
Capacity / Add Lanes · Reconstruction
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed44%
Of the 27 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion456 days
Remaining against FDOT's estimated contract completion date.
Cost sourcesDiffer by 28%
The district’s published project cost and the FDOT feed figure disagree beyond the threshold used to flag a conflict. Both are shown under Cost & funding and in Sources; neither is averaged or dropped.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Contract total (covers 2 projects)Σ FDOT Active Construction lines · contract T4710
$36.2M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$26.2M
Project costFDOT district project site
$36.2M
Phase line item (42154865201)FDOT Active Construction
$26.2M
$8.4M / mileConstruction cost (this project) ÷ 3.1 miles
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
SSState Road (S.R.) 5/United States (U.S.) 1 SUN Trail Project from SE Bridge Road to Osprey Street and S.R. 5/U.S. 1 Resurfacing, Restoration and Rehabilitation (RRR) Project from south of S.R. A1A/SE Dixie Hwy to Osprey StreetProject