Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressFeb 26, 2025 – Jan 4, 2026
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 1.7 miN0.5 mi
RoadwaySR 7
CountyBroward County
Length1.70 miles SW 21st Street to NW 3rd Street – 2.11 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
From S.R. 848/Stirling Road to Orange Drive and from SW 21st Street to NW 3rd Street
1.70 miles SW 21st Street to NW 3rd Street – 2.11 miles
Project length
Resurfacing
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed100%
Of the 10 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion250 days past
Today is past FDOT's estimated contract completion date. Contract time is routinely extended; this is the published estimate, not a finding of delay.
Cost sourcesDiffer by 52%
The district’s published project cost and the FDOT feed figure disagree beyond the threshold used to flag a conflict. Both are shown under Cost & funding and in Sources; neither is averaged or dropped.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Contract total (covers 2 projects)Σ FDOT Active Construction lines · contract T4682
$8.5M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$4.1M
Project costFDOT district project site
$8.5M
Phase line item (44767615201)FDOT Active Construction
$4.1M
Contract line items
447676-1-52-01This phase$4.1M
447676-1-52-02$21.6K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
Project Activity
Data sync: FDOT Active Construction re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Data sync: FDOT Work Program re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Data sync: FDOT Construction Contracts re-readAug 18, 2026
Scheduled data sync — no project fact necessarily changed