Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressJan 21, 2025 – Aug 15, 2026
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 0.8 miN0.25 mi
RoadwaySR 7
CountyBroward County
Length2.424 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
Along NW 16th Street, NW 19th Street, and NW 26th Street; from NW 49th Avenue to State Road (SR) 7/US 441
2.424 miles
Project length
Bicycle & Pedestrian
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed100%
Of the 19 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion28 days past
Today is past FDOT's estimated contract completion date. Contract time is routinely extended; this is the published estimate, not a finding of delay.
Cost sourcesIdentical
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness18 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T4685
$5.5M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$5.5M
Project costFDOT district project site
$5.5M
Phase line item (42957675201)FDOT Active Construction
$5.5M
$2.3M / mileConstruction contract value ÷ 2.424 miles
Contract line items
429576-7-52-01This phase$5.5M
429576-7-52-02$4.9K
429576-7-52-03$56.9K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗