Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressApr 1, 2024 – Jan 1, 2027
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 0.8 miN0.1 mi
RoadwayCR 712
CountySt. Lucie County
Length0.785 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
C.R. 712/Midway Road from west of Jenkins Road to Selvitz Road
0.785 miles
Project length
Capacity / Add Lanes · Reconstruction
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed89%
Of the 33 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion112 days
Remaining against FDOT's estimated contract completion date.
Cost sourcesDiffer by 1.5%
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Contract total (covers 2 projects)Σ FDOT Active Construction lines · contract T4570
$23.8M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$23.1M
Project costFDOT district project site
$23.5M
Phase line item (23144055201)FDOT Active Construction
$22.9M
$29.5M / mileConstruction cost (this project) ÷ 0.785 miles
Contract line items
231440-5-52-01This phase$22.9M
231440-5-52-02$287.7K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗