Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressJun 17, 2025 – Jun 5, 2028
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 1.8 miN0.5 mi
RoadwaySR 838
Length2.3 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
From S.R. 9/I-95 to S.R. 5/US 1
2.3 miles
Project length
Resurfacing
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed42%
Of the 36 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion633 days
Remaining against FDOT's estimated contract completion date.
Cost sourcesDiffer by 89%
The district’s published project cost and the FDOT feed figure disagree beyond the threshold used to flag a conflict. Both are shown under Cost & funding and in Sources; neither is averaged or dropped.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Contract total (covers 2 projects)Σ FDOT Active Construction lines · contract T4705
$55.4M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$6.4M
Project costFDOT district project site
$55.4M
Phase line item (44767815201)FDOT Active Construction
$6.3M
$2.8M / mileConstruction cost (this project) ÷ 2.3 miles
Contract line items
447678-1-52-01This phase$6.3M
447678-1-52-02$46.4K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗