Unlock with TransitAtlas Pro to get full project intelligence and alerts.
Fact sheets, public-meeting materials, and construction updates are published by FDOT District Four. View on the source site
Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressJul 11, 2025 – Mar 18, 2026
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
N0.1 mi
RoadwaySR A1A
Length0.37 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
S.R. A1A/North Ocean Boulevard at NE 27th Street and S.R. A1A/North Fort Lauderdale Beach Boulevard at NE 14th Court
0.37 miles
Project length
Traffic Signals
Scope of work
Construction complete
FDOT status
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed100%
Of the 8 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion177 days past
Today is past FDOT's estimated contract completion date. Contract time is routinely extended; this is the published estimate, not a finding of delay.
Cost sourcesDiffer by 71%
The district’s published project cost and the FDOT feed figure disagree beyond the threshold used to flag a conflict. Both are shown under Cost & funding and in Sources; neither is averaged or dropped.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Contract total (covers 2 projects)Σ FDOT Active Construction lines · contract T4713
$2.1M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$609K
Project costFDOT district project site
$2.1M
Phase line item (45246715201)FDOT Active Construction
$523.6K
$1.6M / mileConstruction cost (this project) ÷ 0.37 miles
Contract line items
452467-1-52-01This phase$523.6K
452467-1-52-02$85.4K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
Project Activity
Data sync: FDOT Active Construction re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Data sync: FDOT Work Program re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Detected change: Status changedAug 20, 2026
Under Construction → Complete
Data sync: FDOT Construction Contracts re-readAug 18, 2026
Scheduled data sync — no project fact necessarily changed