Under ConstructionConstruction complete FDOT D4 Broward County, FL SR 7Bicycle & Pedestrian
Last updated Aug 25, 2026
Project Summary
SW 72nd Avenue from S.R. 824/Pembroke Road to SW 9th Street; SW 25th Street from SW 64th Avenue to SR 7/US 441; and SW 33rd Street from SW 62nd Avenue to S.R. 7/US 441.
Scope of Work
Bicycle & Pedestrian
SR-7/US-441 TRANSIT CORRIDOR IMPROVEMENTS GROUP/PRIORITY 8 - BIKE LANE/SIDEWALK
Categories derived from the FDOT Work Program work-mix code for this project.
Contracts & Awards
Prime contractor
Leon America ConstructionFDOT
Contract
T4689FDOT
Construction contract value
$2.2MDerived
FDOT project manager
Erik NematiFDOT
CEI, subconsultants, project team contacts and award history are part of Pro.
Project Location
Approximate route from FDOT construction data · SR 7.
Project Network Preview
3
Organizations
2
Key Contacts
24
Related Projects
Recent Activity
Status changed · Under Construction → CompleteAug 20, 2026
Detected by comparing FDOT's published data between syncs. Dates are when the change was observed, not necessarily when FDOT made it.
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
SW 72nd Avenue from S.R. 824/Pembroke Road to SW 9th Street; SW 25th Street from SW 64th Avenue to SR 7/US 441; and SW 33rd Street from SW 62nd Avenue to S.R. 7/US 441.
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed100%
Of the 9 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion221 days past
Today is past FDOT's estimated contract completion date. Contract time is routinely extended; this is the published estimate, not a finding of delay.
Cost sourcesIdentical
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T4689
$2.2M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$2.2M
Project costFDOT district project site
$2.2M
Phase line item (42957685201)FDOT Active Construction
$2.2M
Contract line items
429576-8-52-01This phase$2.2M
429576-8-52-02$31.6K
429576-8-52-03$16.8K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
Project Activity
Data sync: FDOT Active Construction re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Data sync: FDOT Work Program re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Detected change: Status changedAug 20, 2026
Under Construction → Complete
Data sync: FDOT Construction Contracts re-readAug 18, 2026
Scheduled data sync — no project fact necessarily changed
SW 72nd Avenue from S.R. 824/Pembroke Road to SW 9th Street; SW 25th Street from SW 64th Avenue to SR 7/US 441; and SW 33rd Street from SW 62nd Avenue to S.R. 7/US 441.