Under ConstructionConstruction complete FDOT D4 Broward County, FL SR 7Bicycle & Pedestrian
Last updated Oct 15, 2026
Project summary
Bicycle & Pedestrian on S.R. 7 in Broward County (SW 72nd Avenue: 0.50 miles; SW 25th Street: 0.52 miles; SW 33rd Street: 0.26 miles).
SW 72nd Avenue from S.R. 824/Pembroke Road to SW 9th Street; SW 25th Street from SW 64th Avenue to SR 7/US 441; and SW 33rd Street from SW 62nd Avenue to S.R. 7/US 441.
Leon America Construction has been building it for FDOT District Four since Apr 25, 2025. FDOT's estimated contract completion was Feb 2, 2026.
Construction contract value
$2.2M
Contract T4689, this project only
Prime contractor
Leon America Construction
FDOT record
Apr 25, 2025100% of contract time elapsed · 292 days past the estimateFeb 2, 2026
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
SW 72nd Avenue from S.R. 824/Pembroke Road to SW 9th Street; SW 25th Street from SW 64th Avenue to SR 7/US 441; and SW 33rd Street from SW 62nd Avenue to S.R. 7/US 441.
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Oct 15, 2026
Contract time elapsed100%
Of the 9 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion292 days past
Today is past FDOT's estimated contract completion date. Contract time is routinely extended; this is the published estimate, not a finding of delay.
Cost sourcesIdentical
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness37 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T4689
$2.2M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$2.2M
Project costFDOT district project site
$2.2M
Phase line item (42957685201)FDOT Active Construction
$2.2M
Contract line items
429576-8-52-01This phase$2.2M
429576-8-52-02$31.6K
429576-8-52-03$16.8K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
Project Activity
Data sync: FDOT Active Construction re-readOct 15, 2026
Scheduled data sync — no project fact necessarily changed
Data sync: FDOT Work Program re-readOct 15, 2026
Scheduled data sync — no project fact necessarily changed
Detected change: Status changedAug 20, 2026
Under Construction → Complete
Data sync: FDOT Construction Contracts re-readAug 18, 2026
Scheduled data sync — no project fact necessarily changed
SW 72nd Avenue from S.R. 824/Pembroke Road to SW 9th Street; SW 25th Street from SW 64th Avenue to SR 7/US 441; and SW 33rd Street from SW 62nd Avenue to S.R. 7/US 441.