Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressFeb 11, 2025 – Feb 13, 2026
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 0.6 miN0.1 mi
RoadwaySR 794
CountyPalm Beach County
Length0.633 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
S.R. 794/Yamato Road from east of S.R. 9/I-95 to S.R. 5/US 1/Federal Highway
0.633 miles
Project length
Resurfacing
Scope of work
Construction complete
FDOT status
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Contract time elapsed100%
Of the 12 months between construction start and estimated contract completion. Time elapsed, not work completed — FDOT publishes no percent-complete figure.
Estimated completion210 days past
Today is past FDOT's estimated contract completion date. Contract time is routinely extended; this is the published estimate, not a finding of delay.
Cost sourcesDiffer by 1.1%
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract E4W95
$3.5M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$3.5M
Project costFDOT district project site
$3.5M
Phase line item (44765715201)FDOT Active Construction
$3.4M
$5.5M / mileConstruction contract value ÷ 0.633 miles
Contract line items
447657-1-52-01This phase$3.4M
447657-1-52-03$17.4K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗
Project Activity
Data sync: FDOT Active Construction re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Data sync: FDOT Work Program re-readAug 25, 2026
Scheduled data sync — no project fact necessarily changed
Data sync: FDOT Construction Contracts re-readAug 18, 2026
Scheduled data sync — no project fact necessarily changed