Project Timeline
PlanningComplete
DesignComplete
ProcurementComplete
ConstructionIn ProgressMar 2, 2027
CloseoutUpcoming
Phase order reflects standard FDOT delivery; only construction dates are sourced.
Project Location
≈ 0.8 miN0.25 mi
RoadwaySR 817
CountyBroward County
Length0.77 miles
Approximate route from FDOT Active Construction. Extent is indicative, not a survey.
Project Brief
From South of SW 24th Street/Nova Drive to Kolsky Boulevard
0.77 miles
Project length
Traffic Operations
Scope of work
Project limits as published by FDOT. Scope categories are mapped from FDOT’s work-mix code list.
Project Health
as of Aug 25, 2026
Estimated completion172 days
Remaining against FDOT's estimated contract completion date.
Cost sourcesIdentical
Measured between the district’s published project cost and the FDOT feed figure. Below the threshold used to flag a conflict — shown so the gap is visible rather than inferred from the absence of a warning.
Data freshness17 days ago
Last read from the FDOT feeds behind this record. Facts change when FDOT publishes, not when we sync.
Cost & funding
Construction contract valueΣ FDOT Active Construction lines · contract T4715
$6.9M
Construction cost (this project)Σ FDOT Active Construction lines for this project
$6.9M
Project costFDOT district project site
$6.9M
Phase line item (44562415201)FDOT Active Construction
$6.5M
$8.9M / mileConstruction contract value ÷ 0.77 miles
Contract line items
445624-1-52-01This phase$6.5M
445624-1-52-02$313.4K
445624-1-52-03$37.1K
Each line is one FDOT financial-project sequence. The project total is their sum; a contract may additionally cover other projects, in which case its total is shown above as contract context rather than as this project's cost.
Bacallao Construction & Engineering Development, LLC D/B/A B
FDOT project manager
Andrea Chung
Contract status
Active
Contract time (bid)
406 days
Time added by adjustments
9 days
Federal project number
D425024B
Cross-check · contracts feed$6.9M
This project's financial-project sequences totalled from FDOT's construction contracts layer — an independent second reading of the cost shown under Cost & funding. The two services are derived separately, so agreement is corroboration rather than a restatement.
Contract facts · FDOT All Construction Contracts · synced Aug 18, 2026 · view source ↗